Find or Sell any Parts for Your Vehicle in USA

Arias Pistons 12.5:1 Compression 82mm Bore Honda B-series on 2040-parts.com

US $499.99
Location:

Orlando, Florida, United States

Orlando, Florida, United States
Condition:New Brand:Arias Manufacturer Part Number:3330420

Categories
WHY CHOOSE US
Arias Pistons 12.5:1 Compression 82mm bore Honda B-Series
Description

Honda/Acura B18c1 DOHC VTEC 
1.8L 
Stock Bore: 82mm
Stroke: 3.433
Rod: 5.430
Head CC: 41.6
Gasket: .028
Deck: .005
Compression Height: 1.180
Dome CC: 6
Compression Ration with Stock Head: 12.5:1 
Required Ring set: 1012303228



Payment is accepted only through Paypal.

We will only ship to the Paypal confirmed shipping address.

Payment for orders should be made within 5 business days.

Sales tax will be charged for orders from Florida.

If you require another payment arrangement, please contact us by email or eBay seller messages.
You may also like this

Cadillac CTS Coupe launch to be delayed until summer 2010

Mon, 26 Jan 2009

One of Cadillac's most anticipated models is being delayed one year. The 2010 CTS coupe had been scheduled to go into production this summer. Instead, the car will go into production during the summer of 2010.

2012 Renault Scenic / Grand Scenic facelift

Fri, 02 Dec 2011

Renault Scenic & Grand Scenic get a facelift for 2012 Renault has tweaked the Scenic and Grand Scenic for 2012 with a mild styling facelift, trim changes and two new engines. The Renault Scenic (and Grand Scenic, too) were really the first in the race to fill a niche for comfortable, versatile transport for ferrying your brood and their stuff. Not completely French-soft in ride – but far more comfortable than most later rivals – and quite well built, the Scenic – with its Megane roots – offers a better than average combination of handling and grip, even if it is a bit compromised by its height.

Nissan UK Battery plans confirmed

Mon, 20 Jul 2009

Nissan - the Renault Nissan Alliance - has confirmed plans for car battery production in the UK and Portugal The aim of the battery production plants is to supply batteries for electric cars built by the Renault Nissan alliance, but Nissan haven’t actually said that they will build any electric cars in the UK. Hmm. The target production is 60,000 annually to be used in a range of Nissan and Renault electric cars that will start to hit the market next year (2010) – in the US and Japan – with full global roll-out by 2010.